What we went to Greenville to finish. We had rented a tractor and dug it out, then layered in gravel the last visit. Since then, Chad had leveled it perfect, added 2-3 inches of sand and leveled it perfect. Then layed most of the pavers. The only thing left to do was cut all the curved pavers, sweep in the sand, and pack it down. We rented a brick saw, cut all the curves, packed the bricks with a power compactor, swept in the sand, then compacted again. Planted 3 camillias to eventually hide the AC unit. Looks great! Local contractor had given them a $5-8000 estimate, and we did it for maybe $2500, including the garage doors that I accidentally ran the tractor into... Plus lots of sweat equity.